Lot · Mechanical
How it works
1910 Antique RITE-RITE Store Display Card with 6 Unopened Packages 4" Long Leads
No bids yet — be first
0 bids · starting bid
Ends in
Closes Aug 1 · 11:43 PM EST
Condition
Used
Condition tiers
New
Used
Refurbished
Damaged
Unspecified
Ships from
ZIP 786**
janw0727
775 ratings · 100.00% positive
Description
From the seller1910 Antique. Display card is 10-1/2" tall x 6-1/2" wide. grooves of the wood boxes. pretty cool. Great survivor and nice display item! Nicer than pictures show! (I'm not a professional photographer!).
Description is reproduced verbatim from the eBay listing. NightBids does not edit seller copy — refer to the live listing for authoritative details, shipping rates and return policy.